Nonconforming Materials Disposition

Nonconforming materials disposition can be simplified into four categories: scrap, return to supplier, rework, and use as is.

Sorting Disposition of Scrap Nonconforming Materials Disposition

Nonconforming materials disposition

In our previous blog, we focused on requirements to identify and segregate non-conforming materials. Once nonconformities are labeled and locked in your quarantine cage, what do you do next? The next step in the process of determining nonconforming materials disposition. The most common dispositions are:

  • Scrap
  • Return to Supplier (RTS)
  • Rework
  • Use As Is (UAI)

Some companies also have dispositions of sort and repair. The sort is not a disposition and often creates confusion for anyone auditing records of nonconforming materials. Sorting is the process that you must perform when a lot of material fails to meet acceptance criteria. Still, some of the individual units within the lot meet the acceptance criteria. In this scenario, the following sequence of events is recommended.

Sorting nonconforming materials

First, the lot is segregated from a conforming product, and an NCR number is assigned. Next, the lot is 100% inspected for the defect, and the results of the inspection are recorded on the inspection record. It is important to record the specific number of non-conforming units on the NCR record–not the total amount inspected. The final step is to release a conforming product back into the production process or warehouse, and the Material Review Board (MRB) will disposition the units identified as non-conforming.

If identifying a non-conforming product requires an inspection method that is not typically performed, then the inspection plan needs to be corrected, or a corrective action plan is needed. New and unforeseen defects may indicate a process change, a change in the raw materials, or inadequate training of personnel at your company or your supplier. An investigation of the root cause is needed, and it is recommended to consider documenting this investigation as an internal CAPA or a Supplier Corrective Action Request (SCAR).

Material Review Board (MRB) determines the nonconforming materials disposition

Most companies have a “Material Review Board” (MRB) that is responsible for making the decision related to the disposition of non-conforming material. Typically, the MRB will be scheduled once per week to review the most recent nonconformities. The board usually consists of a cross-functional team, such as:

  • Quality Assurance
  • Research & Development
  • Manufacturing
  • Supply Chain
  • Regulatory

The reason for a cross-functional team is to review the potential adverse effects of rework and potential risks associated with a UAI disposition. If rework is required, the cross-functional team will typically have the necessary expertise to create a rework instruction and to review and approve that rework instruction–including any additional inspections that may be required beyond the standard inspection work instructions.

Scrap

If the material is going to be scrapped, there is no risk to patients or users. Therefore, the entire MRB team should not be required to scrap products. Because there may be a cost associated with a scrap of non-conforming products, it is recommended that someone from accounting and a quality assurance representative approve scrap dispositions. Other departments should be notified of scrap, but a trend analysis of all non-conforming products should be reviewed by each department and by top management during management reviews. Auditors and FDA inspectors, specifically, will be looking for evidence of statistical analysis of non-conforming material trends and the implementation of appropriate corrective actions.

Return to Supplier (RTS)

Returning non-conforming material to the supplier that produced it is the most common disposition, but the trend of RTS should continuously be improving. If the trend of RTS is not improving, your supplier qualification process or your supplier control may be inadequate. The best way to ensure that the trend is improving is to initiate a SCAR. Some companies automatically wait until they have a trend of non-conforming material before initiating a SCAR. However, if you wait until a defect occurs twice, you are doubling the number of nonconformities for that root cause. If you wait until a defect occurs three times, you are tripling the non-conformities. For this disposition, there also does not need to be approval from the entire MRB. Typically, only someone from the supply chain management and quality assurance are needed to return non-conforming products to a supplier.

Note: You should not always wait until there is a “trend” to request supplier corrective action.

Rework

Almost every auditor looks for a specific phrase in the procedure for Control of Nonconforming Material: “The MRB will review and document the potential adverse effects of rework.” Most companies are doing this, but the procedures often do not specifically state this requirement, and rework instructions are often missing any specific inspection instructions that have been added to reduce risks associated with the rework process. Repeating the normal inspection criteria is seldom adequate for reworked product because the rework process typically results in different defects.

Another phrase that auditors and inspectors are looking for is the requirement to document the rework instructions and to have the instructions reviewed and approved by the same functions that reviewed and approved the normal production process. This requirement is often not specifically stated in the procedure, and FDA 483 inspection observations are commonly issued for this oversight.

Use As Is (UAI)

The UAI disposition should be rare. When I see a large number of NCRs with a disposition of UAI, I expect one of two reasons for this situation. First, the NCRs are for cosmetic defects where the acceptance criteria are too subjective and inspectors need clear guidelines regarding acceptable blemishes and unacceptable nonconformities. The visual inspection guides used during solder joint inspection for printed circuit boards are an excellent example of best practices for clearly defining visual inspection criteria. Personally, I prefer to use a digital camera to take pictures of representative “good” and “bad” parts. Then I create a visual inspection chart with a green, smiley face for “good” and a red, frowny face for “bad.” The best inspection charts identify the proper inspection equipment and quantitative acceptance criteria with pictures and symbols instead of words.

The second reason for a larger percentage of UAI dispositions is that the product specifications exceed the design inputs. For example, if a threaded rod needs to be at least 1” long, but 1.25” long is acceptable, then you should not approve a drawing with a specification of 1.00” +/- 0.05”. Often, the legend of drawings will define a default tolerance that is unnecessary. A more appropriate specification would be 1.13” +/- 0.12”. No matter how much work it is to specifically define tolerances for each dimension on a drawing, the work required to do this at the time of initial drawing approval is much less than the work required to justify a UAI disposition. FDA inspectors will consider a UAI disposition as a potentially adulterated or misbranded product, and a formal Health Hazard Evaluation (HHE) may be required to justify the reason why the product is not recalled.

Regardless of the disposition of the product, the decision for disposition should be a streamlined process that is not delayed unnecessarily. In order to ensure that your non-conforming material dispositions are effective and processed in a timely manner, our next blog in the series about control of non-conforming materials will focus on process interactions, monitoring and measuring of non-conforming product and when to initiate a CAPA or SCAR to prevent more NCRs.

Nonconforming Materials Disposition Read More »